Location risk analysis
Day 1:
Our team shot in an open space on day 1 and we knew the hazards such as unstable flooring, unforseen weather conditions, possible damage to equipment and props etc. But me and the assisstant director of our team, Rehab Fatima, had planned for the precautions before hand such as sturdy footwear to not trip/fall, plastic bags to cover the equipment incase of rain, and clearing the area before filming.
Day 2:
the second day we shot at a different location which was a closed space which had its own hazards such as poor ventilation, sharp objects laying around due to construction, electric shocks etc.
We countered these possible hazards by having a first aid kit reacy just in case and cutting the power to the area we were shooting in by asking the authorities.
Comments
Post a Comment